Error on the dates of the exported files
Posted: Fri Apr 25, 2014 3:04 pm
Hi tickstory,
When I selected a single period as H1, from 01/01/2009 to 04/23/2014, every time I exported, the end date of the program is less than I selected, as the picture below 18/11/2013.

Ps:. Swear I selected the period specified above.
When I selected a single period as H1, from 01/01/2009 to 04/23/2014, every time I exported, the end date of the program is less than I selected, as the picture below 18/11/2013.

Ps:. Swear I selected the period specified above.